Milton Keynes, UK

Plant sheet: Printable pdf
Zoom
Working...
Plant capacity and performance:

• 22,240 metric tonnes DS/year • Doubling digestion throughput
• 2 x 3,750 m³ digesters  • Class A pasteurized product
• 4-reactor Cambi THP + coolers • Increased sludge dewaterability
• +1 MWe and process steam • Importing sludge avoids investments elsewhere
 
In November 2006 Black & Veatch (then GleesonLtd.) signed a contract with Cambi AS for a 
4-reactor Thermal Hydrolysis plant for the pre-treatment of sludge prior to anaerobic digestion 
for Cotton Valley sludge treatment centre. 

The centre is located at Milton Keynes Wastewater Treatment Works with a population equivalent 
of approx. 288,000 but will also import sludge from a similar population equivalent.
 

The benefits of the Cambi process are:

• More than doubling throughput of the existing digesters and making capacity for the      
  next twenty years
• Adding 1 MW of renewable energy
• Improvement of final product to a class A well dewatered product
• Avoidance of further capital expenditure at other sites by importing raw sludge from    
  sites with no digestion

See Cambi's film showing some of the plants, including the plant in Cotton Valley.

Article in World Water Magazine "Milton Keynes harnesses"

Site adress:
Cotton Valley WwTW
Tongwell Street,
Pineham,
Milton Keynes,
Buckinghamshire,
MK15 9PA
UK
http://www.multimap.com/maps/?hloc=GB|Tongwell#map=52.05668,-0.70836|19|256&loc=GB:52.05592:-0.70974:16|MK15 
write the postal code MK159PA


Copyright © - CAMBI - P.O. Box 78 - 1371 ASKER - Norway - Tel: +47 66 77 98 00 - E-mail: office@cambi.no