Plant capacity and expected performance: 

• 20,000 metric tonnes DS/year • Doubled digester loading
• 2 x 4000m³ digesters • Doubled biogas production
• 4-reactor Cambi THP+coolers Class A pasteurized cake
• Extra 1.5 MW green electricity • Avoiding lime operations

On 18th June 2007 Cambi signed a binding Letter of Intent with Black & Veatch/Gleeson, main 
contractor for Anglian Water’s Whitlingham sludge centre upgrade.

Whitlingham (Norwich WWTW) serves a population equivalent of approx. 275,000 but also 
imports half of its sludge from other sites. 

Currently only half of this is digested – the remainder is dewatered raw and treated with 
quick lime. A 4 reactor Cambi THP system is being added to enable all the raw sludge 
to be digested. The digester biogas and electrical generation will also be upgraded.

The plant is a BNR treatment plant and in this case a separate ammonia treatment system 
is being added. Cambi THP was chosen on a best whole-life cost.


The benefits of the Cambi process are:
 

• The cost of the lime operation is avoided without building any more digesters
• Biogas production will be more than doubled and another 1.5 MW of electrical generation will
  be installed
• The overall volume of product is reduced and the amount of land required for spreading is
  reduced because of N removal in the process
• All sludge is Class A and can be stored on site for 6 months or more.