Working...

Plant capacity and expected performance:

• 40,000 metric tonnes DS/year   • Reduced energy for drying and transport
• 3 x 6,300 m³ digesters   • 50,000 tons less carbon emissions
• 8-reactor Cambi THP + coolers • High performance digestion
• 4.7 MW electricity + cogen steam      • Half the original cake volume
• Pasteurized product  
                                                            

In June 2007 Aker-Kvaerner awarded Cambi AS a contract for the supply of a Thermal Hydrolysis 
Process (THP) plant as part of the Bran Sands Advanced Digestion Project. 

Northumbrian Water Ltd (NWL) awarded the Bran Sands project to Aker Kvaerner in the same 
month; a GBP 28 million contract to design, construct, install and commission a facility to extend 
the treatment capabilities of the existing regional sludge treatment centre (RSTC) at Bran Sands 
in the Tees Valley, north-eastern England (Middlesbrough area). 

Bran Sands is one of Northumbrian Water’s largest sites, and the current raw sludge drying 
is maintenance and energy intensive. NWL therefore reviewed existing sludge treatment assets, 
which led to the recommendation of an advanced sludge digestion treatment centre at Bran Sands, 
based on the Cambi THP technology. 

The centre will treat sludge from the existing wastewater treatment plant at Bran Sands and raw 
sludge delivered mainly as dewatered cake to the site from the southern half of NWL and can treat 
up to 40,000 dry tonnes of sludge per year. 

The installation of the Cambi plant and subsequent digestion and dewatering will significantly reduce 
the overall amount of sludge cake to be dried and/or recycled directly to land as an enhanced treated 
product as well as greatly reducing NWL’s carbon footprint by about 50,000 tonnes and generating up 
to 4.7 MWs of renewable electricity from biogas.

The benefits of the Cambi process are:

• Compact digestion plant
• Reuse of existing dewatering assets
• Reduction in volume of cake to half of before situation
• Cost savings in reduction of energy consumption for drying
• Cost savings from green electricity production
• Reduction of carbon footprint by 50.000 tonnes CO2
• Reduction of inter-site transport costs of sludge as raw cake
• Flexibility of Cambi cake of dried product – both Class A products

Article in World Water Magazine "Rising energy costs catalyst for change in sludge strategy"

Where to find the plant:
Bran Sands Treatment Works
Teesport Road
Middlesbrough
TS6 6UE
UK

 