|
|
|
||||||
Dublin, IRL
Plant capacity and performance:
The Cambi 8-reactor THP plant is designed to treat 36,000 tonnes DS sewage sludge annually to be digested and then dewatered and dried. The WWTP was originally operating a two-train drum drying systems of the raw primary sludge to meet the requirements of pasteurisation in Ireland. The plant was extended by adding SBR biological secondary treatment reactors to the existing primary treatment plant, doubling the sludge quantity and reducing sludge dewaterability. This would normally have led to a tripling of dryer expansion because of the much greater water evaporation requirement. However, by adding Cambi THP the digested cake volume was reduced and the dryer project was only expanded by 50%. Also, the required digestion volume was reduced to less than half the conventional: Three 4,300 m3 digesters are fed at about 6 kg VS/m3/day and routinely achieve 60% VS conversion with 45,000 m3 per day of biogas. The benefits of the Cambi process are: • Compact digestion project: ½ to 1/3 of conventional digester volume
|
||||||||||||
|
Copyright © - CAMBI - P.O. Box 78 - 1371 ASKER - Norway - Tel: +47 66 77 98 00 - E-mail: office@cambi.no
|